 |
- at the heart of the installation, the treatment cell,
|
 |
- conveyor belts , for the supply and evacuation of the product,
|
 |
- protective walls,
|
 |
- flooring,
|
 |
- walls of the reinforced concrete building,
|
 |
- electron accelerator,
|
 |
- roof of the reinforced concrete building,
|
 |
- ozone extractor,
|
 |
- technical suite,
|
 |
- electric installation,
- cooling system, working as a closed circuit,
|
 |
- roofing,
|
 |
- control room and dosimetric control area,
|
 |
- security shutters for the protection of the personnel,
|
 |
- exterior fittings,
|
 |
Allowing easy and economic fitting in any production site.
|